Thursday, February 22, 2007

Reducing Data Center Power Consumption

When it comes to data center power, less is clearly more. By reducing the amount of energy their data centers consume, companies can take a burden off electricity suppliers, protect the environment and increase their profits.

Many in the data center industry have already seen the light when it comes to reducing power usage. Technology companies are developing more efficient hardware, researchers are re-evaluating the possibility of converting to DC-power, electricity companies are offering financial incentives for data centers that significantly reduce their energy use, and corporations are revamping their data centers for maximum power efficiency.

This past December, Congress lent further support to the movement to reduce data center power consumption when it passed H.R. 5646 into law. The legislation calls upon the Environmental Protection Agency (EPA) to analyze the consumption of data center power by the federal government and private enterprises.

According to a report by Eric Bangeman of Ars Technica:

“The EPA’s study will fall under the auspices of its Energy Star program, which promotes the use of energy-efficient products. As part of the investigation, it will also consider incentives to encourage the deployment of more energy-efficient hardware in data centers.” The new legislation will help to raise awareness of data center power consumption and will spur the development of additional energy-saving solutions.

The government’s support of energy-efficient data centers creates a winning situation for everyone involved. The increased availability of Energy Star-rated technology, introduction of government-backed incentive programs, and growing public support for energy conservation make the decision to switch to energy-efficient technology an easy one.

Tuesday, February 20, 2007

Computer Room Design Tips

Computer rooms are an important component of the overall data center environment. Their purpose is to shelter network and server infrastructure as well as their related cabling, otherwise known as the computer room’s critical load.

In creating a secure and efficient computer room design, special consideration must be given to good planning and the implementation of the right technologies. The success of your design is dependent on the long-term scalability, flexibility and availability of your facility. Here are some computer room design tips to help your business optimize network performance, achieve its long-term availability goals and avoid costly problems in your computer room:

Power
In any mission critical environment, it’s important to provide adequate, scalable power for the load. Comprehensive load studies can produce a reasonable estimate of your facility’s power requirements. Once you’ve assessed the power needs of your computer room, conceptual and detailed planning can go forward.

Cooling
To design a computer room cooling system that operates effectively, you need a firm understanding of the amount of heat produced by the equipment contained in the enclosed space, along with the heat produced by other heat sources, such as conduction from adjacent spaces. Be sure to account for factors such as ceiling height, access floor depth, equipment layout and overall heat load.

Scalability
The design and construction of your computer room should meet the current technological needs of your business, while allowing for expansion along with the changing technology and business landscape. The use of modular systems, where the characteristics of the modules are known and the steps to add more modules are simple, is an excellent strategy to address growth without major disruptions.

Redundancy
High-availability is accomplished by providing redundancy for all, major and minor, systems, thereby eliminating single points of failure. By installing additional resources for system redundancy, hardware upgrades can be handled without fear of network failures. Incorporate redundant systems into your initial computer room design and continue to do so as your facility expands or upgrades its technology.

Monitoring
After your computer room is complete, the job of monitoring the IT and support infrastructure begins. Computer room monitoring is the vital last line of defense in achieving a high availability environment. When evaluating monitoring systems, look for solutions that are cost effective, easy-to-use, designed with intuitive alarming and escalation methodologies, and built to provide robust reporting all from a central, secure, locations.

Friday, January 26, 2007

Server Room Security Measures

The other day I was reading a news story about hollow coins being used for espionage and it inadvertently got me thinking about server room security issues. While I’m still not 100% sure of the best way to protect your facility against Canadian spy coins, I am aware of a number of techniques for guarding against unauthorized server room access.

To reduce downtime from accidents or sabotage due to the presence of unnecessary or malicious people, it’s important to implement server room security measures that account for a wide variety of potential threats. Whether building a new facility or renovating an old one, you’ll want to begin by mapping out your server room and identifying its most vulnerable areas. These may include access points, sensitive IT equipment and critical elements of the physical infrastructure.

Controlling Access to the Server Room

Server room security begins with controlling access to your facility. Security cards, biometrics and other auditable methods are commonly used to limit who is able to gain entry into the server room, but these methods can only do so much. Security cards, keys or passwords can fall into the wrong hands, while biometrics devices are expensive and may accidentally keep out people who should have access.

If these were your only options, it would be a tradeoff between lower security with convenience and higher security with hassles. By pairing either of these methods with backups such as IP-based camera surveillance, security guards or dry contact sensors, your server room is much better protected. Rather than relying on one strategy, a combination of security measures will provide the best result, particularly if they grow more stringent as you move toward the heart of the facility. By combining methods, you increase reliability.

Reinforcing Physical Infrastructure

From the ground up, the physical infrastructure of your facility should also contribute to your server room security. It pays to incorporate architectural and construction features that discourage or thwart intrusion. For example, make sure the walls of your server room extend past the ceiling, to the roof, to eliminate potential break-in points.

Reinforcing the physical infrastructure of your facility does more than just protect mission-critical IT equipment from theft or sabotage; it also gives protection to HVAC systems, power generators and fire suppression systems – anything that, if compromised, could result in downtime.

Securing IT Equipment

In addition to network security measures, it is important to implement physical security for IT equipment. Within the server room, rack-level security is a top concern. Rack locks defend against unauthorized access to critical equipment by limiting who can touch what. Not only does this help prevent sabotage, it also reduces the number of accidents and mistakes caused by workers interacting with technology that they may not be qualified to use.

Choosing a Security Solution

Every facility has its own unique security needs. When designing a security plan for your server room, carefully weigh your options. The goal is to find an acceptable compromise between security and its expense. By combining an assessment of risk tolerance with an analysis of available technologies and access requirements, it is possible to find an affordable, effective solution that will be accepted by users.

Thursday, January 18, 2007

Data Center Power Solutions

I receive a lot of questions from clients seeking solutions to their problems with data center power consumption. It seems that the higher energy costs rise, the more power the average data center needs. Overall costs for data center power may be skyrocketing, but there are ways to mitigate the expense. Here are some interesting suggestions I’ve come across lately:

- Utilize virtualization software
Virtualization technology is being trumpeted by many as a great way to get more bang for your data center buck. By means of virtualization you can reduce the number of servers that are required to run your applications, thereby increasing the operational efficiency of your data center.

This has become such a hot option that many manufacturers, including Intel, are now building virtualization capabilities into their chips. Companies such as Pacific Gas & Electric Co., which provides electricity to northern California, are jumping on virtualization as an opportunity to cut energy usage by offering financial kickbacks to data centers that save power after implementing virtualization technology.

- Switch from AC-power to DC-power
The idea of running data centers on DC-power isn’t a new one. Since DC requires fewer conversions than AC, there’s great potential for energy savings – some researchers predict a 10 to 20 percent reduction in power costs. Making the switch seems like a no-brainer, right? Unfortunately, higher engineering and technology costs keep DC-power from really catching on. It’s estimated that the cost for DC compatible equipment can climb up to 40 percent higher than that of AC-based technology.

- Install multi-core processors
Multi-core processors can give your data center’s hardware, as well as its energy savings, a boost. Multi-core processors may use slightly more power than a standard processor, but they run faster. This means one multi-core can do the job of several individual processors, reducing the amount of equipment and energy needed to get the job done.

- Optimize your cooling systems
Data center power and cooling go hand-in-hand. To optimize your CRAC systems and reduce energy consumption, focus on adjusting your air flow to eliminate hotspots. A/C units run most efficiently when operating at approximately 80% capacity and when they’re fed the hottest air. If you introduce additional cooling equipment without first trying to improve the efficiency of your existing setup, you’re doing your data center a disservice.

- Have a “Meeting of the Minds” between IT and Facilities Management
People in data center facilities management often complain that the IT team doesn’t properly consult them before purchasing new equipment, which leads to issues with data center power and cooling efficiency. The facilities management team has an intimate knowledge of the data center’s power and cooling infrastructure. By tapping into the combined experience of both departments, companies can sidestep potential energy wasters and keep the data center running at optimal efficiency.

For more solutions regarding data center power or other topics, please visit our Vendor White Paper archive.

Tuesday, December 26, 2006

New Year’s Resolutions for Data Center Solutions

Happy holidays, everyone!

Each year, millions of people form New Year’s Resolutions in the hopes of making a change for the better. I encourage data center managers and other IT professionals to use this annual tradition as an opportunity to reflect on the data center solutions you want – or need – to adopt in order to keep your data center in top condition. Here are a few ideas to get you started:

1. “Eat right/Quit smoking/Drink less”

I’m not suggesting that you or your team members change your lifestyle habits. The idea behind this metaphoric resolution is to improve the overall health of your data center. Consider updating your key processes, tightening up security, keeping a more detailed record of network changes, or coming up with some other solution that will boost your data center’s availability.

2. “Battle the bulge”

Over time, data centers tend to get cluttered. Dirt and dust start to accumulate on mission critical equipment, and employees may try to use perceived “extra space” for storage. This could cause major problems down the road. Straightening things up will not only improve employee moral and health, but also enhance equipment performance and cut down on maintenance costs. Cleaning your data center every day, week, or month will help your machines run better, and keeping the “extra space” empty will improve the efficiency of your environmental systems.

3. “Learn something new”

Don’t let your team get set in its ways. Establish a reading habit that will keep you up-to-date regarding new technologies and data center solutions. Encourage your coworkers to do the same. Also, attend an industry-sponsored convention or open house – it’s a valuable opportunity to make connections and gain a fresh perspective.

4. “Save money”

Find ways to cut costs via server virtualization or other efficiency-boosting solutions. Analyze the efficiency of your air conditioning or electrical systems – a few refinements might result in major financial rewards.

5. “Reduce stress/Enjoy life more”

Once you’ve made strategic improvements to your data center operations based on your IT resolutions, you’ll be able to spend more time making large-scale improvements instead of chasing after minor problems.

Set aside some time this week to write down your own IT resolutions. It’s a small step that will help you start 2007 with your best foot foreword.

Wednesday, December 20, 2006

Puzzling Over Effective Server Room Design

Creating an effective server room design is a bit like piecing together a jigsaw puzzle. Unless you’re a glutton for punishment (which, I admit, some of us probably are), you wouldn’t get started on a puzzle without making sure you had all the right pieces or without looking at the picture on the box to see how the finished puzzle is supposed to look. In order to get the project done as efficiently and effectively as possible, you need to assess the puzzle’s pieces, make a game plan, and then begin work in a systematic manner.

When creating a server room design, not only do you need to take stock of all the elements of the server room, you also need to consider the way those components work together. It’s rare that you get a server room design right on the first try – throughout the design process, you’ll need to adjust for different design elements to make sure the systems work harmoniously.

To make sure your team has all its pieces in place, begin by meeting with your IT and facility staff to review your server room objectives based on your existing systems and facility. With your company’s design goals in mind, your team can evaluate the availability expectations as well as the requirements for your server room’s power and cooling density. From this point, you can develop a conceptual server room design and draw up construction budgets and timelines.

The end-result of your design project should be a server room that not only provides enhanced scalability, flexibility and server availability, but also concurrent maintainability and fault-tolerance against failures in which a component must be replaced.

To evaluate the quality of your server room design, consider the following points:

1. The server room should accommodate your current needs, as well as your facility’s expansion for up to five years in the future. If it doesn’t, you may need to go back to the drawing board.

2. Your location should be centralized and in a secure location. Try to avoid placing the server room near in the basement, on the ground floor, near bathrooms, and near the roof or exterior walls because of flooding and climate control issues. Also, avoid high traffic areas in order to improve the security of your server room.

3. When evaluating your server room’s power and cooling requirements, don’t stop with just the servers or the air conditioning system. Consider the impact of air flow, floor space, lighting, UPS, fans, and other hardware. Each of these elements affects your design’s power and cooling loads. You may have to revisit your plans multiple times to create an efficient server room design..

4. Take security seriously. Control access to your server room via auditable methods and consider installing security cameras.

The true test of an effective server room is whether your design will allow for future expansion while remaining reliable and cost-effective in the present time. Through careful planning, you can design a sophisticated, successful server room that meet your company’s demands for years to come.

Tuesday, November 21, 2006

Data Center Construction Made Easier

Based on first-hand experience, I can tell you that there’s plenty of stress involved and detail required in even a minor data center construction project. Compound this with a 24x7 availability requirement, and the quantity and complexity of systems required in today’s mission critical facilities and what you have is today’s typical data center construction project.

Data center construction project managers often find themselves hard pressed to minimize the interruption to day-to-day operations, while still keeping costs in check. Many firms today simply don’t have the manpower, or the expertise to be able to effectively administer a construction project – especially a construction project as complex and crucial as a data center. If this sounds like your present situation, or perhaps is just one that you’d like to avoid, you may want to consider hiring a construction consultant to assist in the development of your facility.

A data center construction consultant can guide you every step of the way, from the first realization that some scope of change is required, to the final systems commissioning and use training. Here are some of the common areas that consultants typically handle:
- Assessment and Planning
- Design and Specification
- Architecture/Engineering
- General Contracting Support
- Construction Management
- Equipment Sourcing and Scheduling
- Construction/Installation/Integration
- Commissioning
- Operations & Maintenance
- Monitoring

Hiring a Consultant

When hiring a consultant to help with such an important project, you’ll want to take as much care in selecting that person or firm as you would one of your permanent employees. Make sure the consultant is responsive to your business needs and is able to communicate effectively with your existing staff. Additional factors to consider include:

- Has the consultant worked on similar projects in the past? You want to find someone who has experience working with budgets and timelines that are similar to your own.

- How much attention will your project receive? It’s usually a good sign when a consultant is in demand – you want to hire someone that has long-term, repeat clients. However, if the consultant doesn’t make your project a priority or has a hard time returning your calls, you’re in for trouble.

- Will the consultant sign a confidentiality agreement? By signing a confidentiality agreement, you and the other employees at your company can feel more comfortable working with your consultant, thus improving project communications and creating a more pleasant (and productive) work environment.

With the support of an individual consultant or a team of experts, you can achieve the up-to-date, state-of-the-art data center you need, providing you with the integrated, and completely manageable facility that makes your job easier, and your company more profitable.

Thursday, November 09, 2006

Eco-Friendly Solutions: Build a Green Data Center

Recycled goods, alternative power sources and energy-saving technology are becoming commonplace in many homes and businesses. It’s a sign of the times as energy costs continue to climb and public concern over environmental issues grows. Data centers are not immune to this eco-friendly trend and, in fact, are reaping great benefits from going green.

For companies looking to build a data center, the traditional strategy focused on achieving maximum up-time. Little regard was paid to conserving energy or creating an environmentally conscious design. Only in the past decade have data center builders begun to realize that the higher upfront costs of creating a green facility are offset by the lower long-term operations and maintenance costs.

If you build a data center with the environment in mind, you’re likely to find that the benefits go far beyond just helping our planet. Not only will you use less energy and save more money, many states offer tax incentives to companies that build a green data center. Green data centers also provide a healthier work environment for employees and help build positive relations with the surrounding community.

Going green is a great way to help your company financially while helping the world ecologically. Here are some strategies that you can use to build a data center that’s eco-friendly:
- Use scalable or modular systems so you use only the needed energy capacity,
- Put catalytic converters on your backup power generators,
- Install a synthetic white rubber roof to dissipate external heat,
- Coordinate your mechanical and electrical systems so they run at optimal efficiency,
- Build your data center using recycled or low-emission materials,
- Establish a waste recycling program in your data center and recycle your obsolete machines,
- Cut down on power expenses by incorporating more natural light into your building design, and
- Run your facility using solar or wind power.

By making it your goal to reduce heat, improve efficiency and minimize the use of toxic materials, you can redesign an existing facility or build a new data center with a reduced environmental impact. What could be better than helping the Earth stay green while putting some additional green in your wallet?

Tuesday, October 31, 2006

The Pros and Cons of Data Center Colocation

Data center colocation plays a strategic role in modern IT operations. For many companies, it presents an attractive alternative to building and maintaining a sizeable data center.

Housing servers and network equipment off-site does offer companies a number of benefits, but the picture isn’t as simple as black and white. Before you commit to colocation, here are a few things to consider:

Data center colocation allows you to…
- Eliminate the up-front costs associated with building your own data center,
- Deploy IT infrastructure based on your company’s current network requirements with less impact to your budget, and
- Relocate the company without subjecting your network to downtime or other interruptions.

Data center colocation becomes a less attractive option when…
- The overall space and load requirements are substantial,
- Your data center requires intensive management, and
- Physical security is a major concern for your company.

Data center colocation providers can charge based on a number of requirements, including total physical space, amount of bandwidth, amount of UPS protection, quantity and type of power distribution, and the degree of physical security needed. That’s in addition to the cost of other managed services that take the place of your in-house staffing and tools. It’s easy to see how the costs can add up if your data center is high-maintenance in one or more of these areas.

Colocation is not a one-size-fits-all solution for data centers. Much like choosing between buying your own house versus renting an apartment, the decision to maintain your own data center or hire a colocation provider should be weighed based on your company’s present and future needs. Companies often benefit from colocation in the short term, but the option to house servers and network equipment off-site needs to be evaluated based on your big picture.

Wednesday, October 11, 2006

Datacenter Solution: Server Virtualization

You’ve probably heard the phrase, “Don’t put all your eggs in one basket.” Does this folksy wisdom hold true when it comes to server virtualization? Virtualization is an increasingly popular datacenter solution that divides the resources of your physical server into multiple isolated virtual environments. Instead of maintaining one application per physical server, virtualization enables dominant workloads to run simultaneously on the same server.

Although conventional wisdom tells us that putting all your eggs in one basket is fool-hardy idea, carrying a bunch of baskets around doesn’t seem like a smart solution either. Should you consolidate many physical servers into fewer servers hosting virtual machines or would you be better off maintaining a 1:1 ratio of servers to applications? Deciding which solution is the best for your datacenter depends on a number of factors. To help you weigh your options, here are some pros and cons of server virtualization:

Reasons to Keep Your Eggs in One Basket:
The Benefits of Server Virtualization

Carrying one basket is better than carrying several mostly-empty baskets.
- Virtualization makes better use of datacenter resources by utilizing more of the available capacity on each server, thereby increasing the operational efficiency of your datacenter.

You don’t want to use more than one arm to carry your eggs.
- By reducing the number of servers that are required to run your applications, you improve the manageability of your facility. This means that fewer administrators are needed, allowing you to reduce costs.

You don’t have space for all those other baskets.
- Virtualization enables datacenters to reclaim space in the server room and allows companies to better handle future growth without high capital cost support infrastructure changes. Instead of adding a new physical server for each new operating system, the number of servers can be reduced while the number of operating systems stays the same or increases.

Reasons NOT to Keep Your Eggs in One Basket:
Problems with Server Virtualization

If you drop your basket, all of the eggs could break.
- With multiple applications hosted on each server, a catastrophic failure in a single server could cripple your operations. The cost of establishing an adequate contingency plan should be factored into your virtualization strategy from the beginning in order to make this datacenter solution effective.

An egg-filled basket is heavy – you’d need to invest in a stronger basket.
- If all your eggs are in just a few baskets, you want to make sure those baskets are sturdy. Many organizations use inexpensive servers without high-availability (HA) components for lightly-used applications. Once virtualized, a server must be HA in order to support the mission critical load. Thus virtualization often increases the overall cost of each server while reducing the quantity of servers.

You might need to hire someone to help carry that big basket of eggs.
- Before introducing virtualization technology, you’ll need to send your IT staff for training in virtualization deployment and management, or hire an outside firm to provide virtualization support. Also, while virtualization may reduce your overall hardware costs, the datacenter solution increases the complexity of your operations. This introduces new support costs since you have to maintain the virtualization software in addition to your existing operating system and applications.


Egg-basket metaphors aside, the decision to enhance your datacenter using a virtual machine model is a matter of weighing the benefits against the expenses of virtualization. Server virtualization is not a one-size-fits-all datacenter solution, but it’s an approach to consolidation that many businesses may find beneficial.