Not all data cabling contractors are the same. There are many companies and individuals who can perform adequate data cabling for data centers, computer rooms, server rooms, IDFs, desktops, etc. However, not all can capably manage a complex project with many moving parts such as demolition, construction, deployment, testing, troubleshooting, and integration. This is where PTS Data Center Solution's Data Cabling team excels.

Unlike many other contractors, PTS understands the keys to becoming your trusted data cabling provider:
  • Be competitively priced
  • Respond quickly to requests for quotes (RFQs)
  • Produce quality work on time and on schedule
  • Perform exceptional data cabling project management
  • Deliver superior quality control
  • Supply outstanding project closeouts with proper documentation, as built drawings, and test results
PTS has RCDD staff engineers, expertise installing cable per ANSI / IEEE / BICSI standards, 30+ years of industry experience.  Services include:

To learn more, check out our new website, Data Cabling Services

http://data-cabling.ptsdcs.com/index.asp

Monday, December 16, 2013

Are Company Owned Computer Room Deployments Making a Comeback?

Like many other market sectors, the data center space has its ebbs and flows. The latest trend and forecast is that cloud computing and colocation are continuing to grow in popularity and one day, due to cloud's promise of ubiquitous computer platforms, could nullify the need for company-premise-built data centers or computer rooms. That said, this promise has lingered for some time now without being realized. In fact, at PTS Data Center Solutions we see a different, more recent trend.

For example, in the last several years, the northeastern U.S. has experienced substantial utility outages due to inclement weather (Hurricanes Irene in 2011 and Sandy in 2012). Given these extended outages, for over a year now, PTS has been called upon to engineer and install more whole-facility backup power generation systems than ever before. Further, and in keeping with Levitt and Dubner's position in their book Freakonomics, that there is a hidden side to everything - so it seems to be the case with this whole-building generator boom.

For small- and mid-size companies, installing a generator is the single highest CAPEX obstacle to realizing a corporate computer room (what PTS refers to as a "Tenant-Space Computer Room"). However, it's those very companies that have realized their operations (much less their computer rooms) cannot go without power for an extended period of time and as a result are installing whole-facility backup power systems. What was once the largest financial impediment to computer room ownership is now gone. Along with this is the promise of eliminating the ever increasing OPEX of an outsourced IT model.
data center generator
At the same time, given IT's ability to deliver operational resiliency, CIOs and CFOs alike are realizing not every data center facility needs to operate as a Tier IV bunker. It's even more premature to state that cloud computing is taking over. PTS is actually experiencing a resurgence in company built and operated data centers and computer rooms. As such, you can almost hear Yogi Berra's immortal words, "it ain't over 'til it's over".

It is likely the industry will hit a stasis point between in-sourced and out-sourced data center facility and IT operations. Many enterprises already have (or will have) a hybrid model whereby some applications are cloud based (i.e. Salesforce.com), while others are housed in company owned and operated data centers.

PTS, too, is currently undergoing a transformation by including our own cloud data center site and services offering as part of our new HQ facility build. This offering will complement our client premise-based IT and facility solutions. This way, PTS will be prepared for whichever way the wind blows (pun intended).
PTS Cloud Computing
If you are considering expanding your data center or adding a generator to improve expected uptime, it may be prudent to reach out to a professional data center design & engineering team to discuss your requirements, options, and costs. Also, there are a variety of issues that should be discussed prior to considering a generator deployment for any enterprise.