Creating an effective server room design is a bit like piecing together a jigsaw puzzle. Unless you’re a glutton for punishment (which, I admit, some of us probably are), you wouldn’t get started on a puzzle without making sure you had all the right pieces or without looking at the picture on the box to see how the finished puzzle is supposed to look. In order to get the project done as efficiently and effectively as possible, you need to assess the puzzle’s pieces, make a game plan, and then begin work in a systematic manner.
When creating a server room design, not only do you need to take stock of all the elements of the server room, you also need to consider the way those components work together. It’s rare that you get a server room design right on the first try – throughout the design process, you’ll need to adjust for different design elements to make sure the systems work harmoniously.
To make sure your team has all its pieces in place, begin by meeting with your IT and facility staff to review your server room objectives based on your existing systems and facility. With your company’s design goals in mind, your team can evaluate the availability expectations as well as the requirements for your server room’s power and cooling density. From this point, you can develop a conceptual server room design and draw up construction budgets and timelines.
The end-result of your design project should be a server room that not only provides enhanced scalability, flexibility and server availability, but also concurrent maintainability and fault-tolerance against failures in which a component must be replaced.
To evaluate the quality of your server room design, consider the following points:
1. The server room should accommodate your current needs, as well as your facility’s expansion for up to five years in the future. If it doesn’t, you may need to go back to the drawing board.
2. Your location should be centralized and in a secure location. Try to avoid placing the server room near in the basement, on the ground floor, near bathrooms, and near the roof or exterior walls because of flooding and climate control issues. Also, avoid high traffic areas in order to improve the security of your server room.
3. When evaluating your server room’s power and cooling requirements, don’t stop with just the servers or the air conditioning system. Consider the impact of air flow, floor space, lighting, UPS, fans, and other hardware. Each of these elements affects your design’s power and cooling loads. You may have to revisit your plans multiple times to create an efficient server room design..
4. Take security seriously. Control access to your server room via auditable methods and consider installing security cameras.
The true test of an effective server room is whether your design will allow for future expansion while remaining reliable and cost-effective in the present time. Through careful planning, you can design a sophisticated, successful server room that meet your company’s demands for years to come.
Welcome!
This blog is brought to you by the consultants and engineers at PTS Data Center Solutions.
PTS Data Center Solutions designs, builds, and operates data centers that are great for companies and their people, but better for the planet. Visit us at www.ptsdcs.com.
PTS Data Center Solutions designs, builds, and operates data centers that are great for companies and their people, but better for the planet. Visit us at www.ptsdcs.com.
Tags
computer room design
(8)
computer room energy efficiency
(4)
data center
(4)
data center cleaning
(3)
data center cooling
(8)
data center design
(23)
data center energy efficiency
(5)
Data Center Infrastructure Management
(7)
data center migration
(5)
data center relocation
(7)
DCIM
(12)
DCMMS
(4)
disaster recovery
(12)
pts data center solutions
(68)
server room design
(7)
virtualization
(10)
Links
Wednesday, December 20, 2006
Search all PTS Sites
Recent Posts
Hyperconvergence eBook
Download a free copy of Hyperconverged Infrastructure for Dummies (eBook in PDF format) by Scott D. Lowe. You may also view the associated pre-recorded webinar: Hyperconvergence for Dummies Q&A.
PTS Open Lease
Popular Posts
-
A number of clients have asked us about the viability of replacing their ‘wet’ sprinkler systems with a dry-type fire suppression system, s...
-
Data centers are facing unprecedented challenges and opportunities as they cope with the growing demand for generative AI and other cutting...
-
Reopen with Confidence As the world enters the next phase of the pandemic, businesses are forced to make changes to accommodate not only a ...
-
Why Make Data-Driven Decisions? For businesses, the importance of data analytics and business intelligence cannot be overstated. Small busin...
-
As anticipation builds around Nvidia’s forthcoming announcements, a critical issue has resurfaced within the data center domain: the sign...
-
How Edge Data Center Solutions are Evolving for New End User Needs What You’ll Learn: Why do edge facilities require more customization? ...
-
PTS Offers a Turnkey Leasing Solution There are many compelling reasons to lease equipment. Implementing a leasing strategy provides ben...
-
Last week I posted the following discussion question in our Computer Room Design networking group at LinkedIn.com. I’m really impressed wit...
-
PTS Data Center Solutions considers generators as a key to data center reliability. Supplementing a battery-based uninterruptible power sup...
-
The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto t...