- Does not rust
- Provides a lower installed cost compared to other welded or soldered system
- Has the lowest friction loss of any pipe on the market
- Does not require chemical treatment
- Does not require an open flame, glues, or chemicals to fuse it together; It uses heat fusion to bond
- Limit liability of theft on job sites (it has no scrap value, unlike copper which is often stolen from job sites)
- Requires less external insulation (due to R-value~1)
- Resist condensation if left exposed
- Mitigates sound transmission and physical vibrations
- Can be directly buried underground
- Will not burst if water freezes within it (above –20F)
- Forms a monolithic piping system when assembled (no gaskets, solder, weld slag, glue, etc.)
- Approved for HVAC, domestic water, sprinkler systems, irrigation, chemical drains, and food grade applications
- Available in pipe sizes ranging from 3/8” up to 24” diameter
- Proven 40+ year track record of installation around the world
Welcome!
PTS Data Center Solutions designs, builds, and operates data centers that are great for companies and their people, but better for the planet. Visit us at www.ptsdcs.com.
Tags
Links
PTS Data Center Solutions, Inc.
PTS has both Facilities and IT experience, having integrated and tested many of the best-of-breed technologies the industry has to offer.PTS Design & Engineering
PTS specializes in all aspects of architectural as well as mechanical, electrical, and plumbing (MEP) and building services engineering for virtually every type of building or structure.PTS IT Services & Solutions
Managing IT so you can make better... smarter... faster... and more economical data-driven decisions
Friday, January 30, 2015
Monday, April 09, 2012
PTS Exhibiting at Con Edison Energy Efficiency Summit 2012
Join PTS Data Center Solutions at the Con Edison Energy Efficiency Summit on May 1st at the Hilton New York Hotel. The second annual event brings together building contractors, manufacturers, and consultants working to reduce business energy consumption. Many reports state greater than 50% of the power burden for businesses resides in the data center and its IT and facility support infrastructure. Leveraging our proprietary data center & energy usage assessment approach, PTS provides actionable recommendations to reduce energy consumption and green the data center.
Register and get the event details here or learn more about PTS' role as a Market Partner to ConEd focused on assessing and improving energy efficiency within data centers and computer rooms.
Search all PTS Sites
Recent Posts
Hyperconvergence eBook
PTS Open Lease
Popular Posts
-
A number of clients have asked us about the viability of replacing their ‘wet’ sprinkler systems with a dry-type fire suppression system, s...
-
Data centers are facing unprecedented challenges and opportunities as they cope with the growing demand for generative AI and other cutting...
-
Reopen with Confidence As the world enters the next phase of the pandemic, businesses are forced to make changes to accommodate not only a ...
-
Why Make Data-Driven Decisions? For businesses, the importance of data analytics and business intelligence cannot be overstated. Small busin...
-
As anticipation builds around Nvidia’s forthcoming announcements, a critical issue has resurfaced within the data center domain: the sign...
-
How Edge Data Center Solutions are Evolving for New End User Needs What You’ll Learn: Why do edge facilities require more customization? ...
-
Last week I posted the following discussion question in our Computer Room Design networking group at LinkedIn.com. I’m really impressed wit...
-
PTS Offers a Turnkey Leasing Solution There are many compelling reasons to lease equipment. Implementing a leasing strategy provides ben...
-
PTS Data Center Solutions considers generators as a key to data center reliability. Supplementing a battery-based uninterruptible power sup...
-
The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto t...