It has been several years since the August 2003 Blackout, but I can't help thinking that we are all being lulled to sleep on the next major grid issue. There are only 3 main power grids in the US so if I have my primary Data Center on the Eastern Interconnect then should my DR requirement be to locate my back-up site in TX on the ERCOT Grid or in the west on the WSCC Grid. Or is there any benefit to locating on a different NERC region in which case there are 10 regions in the US. Can that benefit equivalent to being on a separate grid? I would doubt it since the 2003 Blackout crossed multiple NERC regions in the Eastern Grid.
http://www.eere.energy.gov/de/us_power_grids.html
Should I not be concerned with this & just choose a site or build a site with a higher level of redundant & back-up power? Is it more important to have the DR site in a location easily accessible for our technical experts than it is to have it on a different grid? Remember 911 grounded flights so if we had another event of that magnitude it would take days for my technical experts to get to our DR site if they could at all. Of course we can introduce many tools for full remote control & power control where access to our physical environment becomes less important so should I make it best practice to get that DR site on a separate grid? If I put locating my DR site into my key design criteria where should it fall on my priority list?
Welcome!
This blog is brought to you by the consultants and engineers at PTS Data Center Solutions.
PTS Data Center Solutions designs, builds, and operates data centers that are great for companies and their people, but better for the planet. Visit us at www.ptsdcs.com.
PTS Data Center Solutions designs, builds, and operates data centers that are great for companies and their people, but better for the planet. Visit us at www.ptsdcs.com.
Tags
computer room design
(8)
computer room energy efficiency
(4)
data center
(4)
data center cleaning
(3)
data center cooling
(8)
data center design
(23)
data center energy efficiency
(5)
Data Center Infrastructure Management
(7)
data center migration
(5)
data center relocation
(7)
DCIM
(12)
DCMMS
(4)
disaster recovery
(12)
pts data center solutions
(68)
server room design
(7)
virtualization
(10)
Links
Wednesday, April 15, 2009
Search all PTS Sites
Recent Posts
Hyperconvergence eBook
Download a free copy of Hyperconverged Infrastructure for Dummies (eBook in PDF format) by Scott D. Lowe. You may also view the associated pre-recorded webinar: Hyperconvergence for Dummies Q&A.
PTS Open Lease
Popular Posts
-
A number of clients have asked us about the viability of replacing their ‘wet’ sprinkler systems with a dry-type fire suppression system, s...
-
Data centers are facing unprecedented challenges and opportunities as they cope with the growing demand for generative AI and other cutting...
-
Reopen with Confidence As the world enters the next phase of the pandemic, businesses are forced to make changes to accommodate not only a ...
-
Why Make Data-Driven Decisions? For businesses, the importance of data analytics and business intelligence cannot be overstated. Small busin...
-
How Edge Data Center Solutions are Evolving for New End User Needs What You’ll Learn: Why do edge facilities require more customization? ...
-
As anticipation builds around Nvidia’s forthcoming announcements, a critical issue has resurfaced within the data center domain: the sign...
-
Last week I posted the following discussion question in our Computer Room Design networking group at LinkedIn.com. I’m really impressed wit...
-
PTS Offers a Turnkey Leasing Solution There are many compelling reasons to lease equipment. Implementing a leasing strategy provides ben...
-
The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto t...
-
PTS Data Center Solutions considers generators as a key to data center reliability. Supplementing a battery-based uninterruptible power sup...