Monday, July 20, 2009

LinkedIn Discussion on Eliminating the Battery String

Thanks to everyone who’s participated in our Computer Room Design networking group at LinkedIn.com so far! We’re off to a great start, with over 200+ members joining in the first two weeks. I’d like to share highlights from one of our recent discussions…

Kevin Woods, Director of Business Development and Sales at i2i, asked:

Eliminating the Battery String? Does anyone have experience/opinion on the viability of the UPS/CPS systems? They incorporate a flywheel in between the generator and engine and in cases of power interruption, the flywheel uses kinetic energy to power the generator for up to 30 seconds while the engine is engaged.


ANSWERS:

• Mark Schwedel, business partner at EMC and advisor for Green Rack Systems, recommended taking a look at the patent for an improved UPS/CPS system, which employs a high-efficiency uninterrupted power supply function integrated with an engine-generator set that combines both short term protection against momentary power interruptions with longer term power generation.

• Gordon Lane, Facilities Coordinator at Petro Canada, shared his experience:
Not a direct comparison to gen/engine set up but I have a flywheel UPS system that has been in service for 23 years. Very reliable, change the bearings every 50000 hours - about 6 years - and we have just about completed a program of taking the MGs out for cleaning and re-insulation.

Obviously coming to end of life, 20 yrs was estimated life, but the serviceability has been phenomenal.

Certainly looking to replace with a similar system and I believe Caterpillar has a flywheel UPS solution that they integrate into their diesel offerings.

• Jason Schafer, Senior Analyst at Tier1 Research, explained in part:
My personal issue with flywheel solutions, aside from the reliability that both sides will argue, is that 30 seconds simply isn't enough time when you are talking about the criticality most datacenters need. The most common argument relates to allowing time to manually start a generator; and flywheel advocates will say "if a generator doesn't start in 30 seconds it's not very likely that it's going to start in 20 minutes" - I disagree with this. I've seen, on more than one occasion, where generator maintenance was being performed and through human error the EPO switch on the generator was mistakenly left pushed in. There's no way anyone is going to identify the problem and fix it in 30 seconds - I'd be surprised if anyone even got to the generator house in 30 seconds after a power outage. Minutes, however, are a different story.

I'm not saying that flywheels and CPSs don't have their place - I think they do, or rather will in large scale in datacenters, but we're not quite there yet. When virtualization plays a part in the redundancy and fault tolerance of a datacenter, where ride-through in the event of a power outage is more of a convenience than a necessity (a-la Google's datacenters - they can lose an entire facility and continue on for the most part), you'll see flywheels gain more traction.


What are your thoughts on the viability of the UPS/CPS systems? Please share your experience by posting a comment here, or by continuing the discussion in the Computer Room Design Group on LinkedIn.

Thursday, July 16, 2009

Introducing PTS’ Data Center Education Series

How extensive is your knowledge about all aspects of your data center? With our newly launched Data Center Education Series, you will never look at your IT and support infrastructure the same way again.

PTS’ Data Center Education Series will help you better assess problems in your data center by providing you with substantive knowledge that you can take back to your data center to improve operations, availability, and efficiency - ultimately reducing operating cost and improving service delivery to your users.

The education series provides students with comprehensive, vendor-neutral, module based training led by the data center design experts from PTS. We discuss the most pertinent topics in the data center industry, tying in case studies and real world situations to provide the knowledge you need to understand, operate, manage, and improve your data center.

The Standard Training Series is a three (3) day class held multiple times per year at major cities across the United States, Canada, and Europe. Our next session will take place in Midtown NYC from September 15-17th -- visit our site to view the agenda. Can’t make it to NYC? We'll also be coming to Chicago (October 21-23) and Dallas (December 7-9). I encourage you to reserve your seat today, as space is limited.

The education series will cover the following topics:

• Fundamentals of Data Center Cooling
• Fundamentals of Data Center Management
• Fundamentals of Physical Security
• Fundamentals of Fire Protection
• Fundamentals of Data Center Power
• Fundamentals of Data Center Maintenance
• Fundamentals of Designing a Floor Plan
• Fundamentals of Data Center Cabling
• Fundamentals of Energy Efficiency

Priced at only $1,795 per student, the training includes all course materials in addition to a continental breakfast and lunch each day. Additionally if you attend with other colleagues from work, you'll all receive a 10% discount. You'll realize an ROI quickly from this invaluable and intimate knowledge, in which straight from data center experts in this in-depth, intimate training series.

Data Center Education Series – Customized for your needs!

We also offer education programs customized to your IT team’s needs. If you have a large group and need training, we can come to you and present those topics of most interest to you! Choose your desired location (typically your own facility). Choose the topics you want to see, including any or all of the available topics from the standard 3-day training class.

In addition, if you have a topic in mind you don't see currently listed in our offerings, we'll build it for you for only a nominal fee to cover time and material costs.

The Customized Training Series is priced at $15,000 for 2 days or $20,000 for 3 days plus travel expenses. In addition to the training, you have option to purchase a one-day data center site assessment for $5,000. This assessment will be performed prior to the training in order to allow the training to address issues found in the assessment.

Please join us on LinkedIn & Twitter

PTS is excited to provide our peers with a new online forum in which to discuss the planning, design, engineering, and construction of data centers and computer rooms.

If you’ve been reading our blog for a while, you may already be aware of our Facebook Page at https://www.facebook.com/PTSDataCenter. (A big ‘thank you’ to everyone who’s added themselves as fans!) Today, I’m happy to announce that PTS is further expanding our online presence with the goal of facilitating the open exchange of ideas among small-to-medium sized data center and computer room operators.

At the forefront of this effort is the newly created Computer Room Design networking group on LinkedIn.com. You can check it out by visiting http://www.linkedin.com/groups?gid=2099901. Hosted by the consultants and engineers at PTS Data Center Solutions, the group is an open forum in which professionals can share industry-related news, ideas, issues and experiences.

Membership is free and open to all professionals and vendors in the computer room and data center industry. We hope that industry leaders will look at this as an opportunity to share knowledge, discover new services and opportunities, and expand their networks.

So far, our networking group on LinkedIn.com has attracted broad interest, gaining more than 100 members in the first week alone. Featured discussions include best practices for consolidation strategies, how to combat downtime in the data center, and industry concerns regarding the Power Usage Effectiveness (PUE) metric.

This thought leadership is further supported on PTS’ Twitter profile (http://twitter.com/ptsdatacenter) which features the latest industry news, highlights from the LinkedIn networking group, and insights from our engineers. If you’re on Twitter, please send us a message and we’ll be sure to follow you back!

Monday, June 29, 2009

Energy Efficiency Remains Priority In Spite of Economic Troubles

In lean times, data centers are learning to do more with less. The Aperture Research Institute of Emerson Network Power just released the results of a study showing that, despite the global economic downturn, energy-efficiency is still a top-of-mind objective for many data centers. In fact, data center managers are concentrating on resolving efficiency issues as a way to balance increasing demand for IT services with stagnant budgets.

The report reveals that:

Data center managers will look at ways to squeeze more from their existing resources, with 80 percent of those surveyed saying they can create at least 10 percent additional capacity through better management of existing assets. Thirty percent of those surveyed said they could find an additional 20 percent. There is likely to be a revitalized focus on tools that provide insight into resource allocation and use.

Data centers will also look to green initiatives to help manage their operating expenses, with 87 percent of those surveyed having a green initiative in place and the majority expecting to continue or intensify these efforts.


The survey data also suggests that the downturn will have "little effect on the demand for IT services" – a positive indicator for economic recovery. I recommend downloading the full Research Note as a PDF at the Aperture Research Institute’s website. It’s an interesting read.

Wednesday, June 24, 2009

Investing in Energy-Efficient Equipment

In "Taking Control of the Power Bill", Bruce Gain takes a look at how many data center admins are retooling their IT infrastructures’ power needs to accommodate growth and slash costs. He notes that although many admins struggle with having to pay additional costs associated with switching to more eco-efficient server room cooling, airflow designs, and other related equipment, paying for more expensive yet efficient equipment is a smart investment when you look at the big picture.

In order to justify that investment, admins should calculate the ROI offered by different scenarios. By creating models to outline the costs of ownership for different configurations and doing a full costs-benefits analysis, you can ease the decision making process. Once you begin making the switch to a more energy-efficient approach, it’s recommended that your organization phase in new equipment as part of the natural growth and evolution of your IT systems.

Michael Petrino, vice president of PTS, also offers his thoughts on the subject, providing a concrete example of cheaper yet less efficient components vs. more power-efficient but costly alternatives. I encourage you to check out the full article in Vol.31, Issue 17 of PROCESSOR.

Tuesday, June 09, 2009

Drug Companies Put Cloud Computing to the Test

Traditionally characterized as "late adopters" when it comes to their use of information technology (IT), major pharmaceutical companies are now setting their sights on cloud computing.

Rick Mullin at Chemical & Engineering News (C&EN) explores how Pfizer, Eli Lilly & Co., Johnson & Johnson, Genentech and other big drug firms are now starting to push data storage and processing onto the Internet to be managed for them by companies such as Amazon, Google, and Microsoft on computers in undisclosed locations. In the cover story, “The New Computing Pioneers”, Mullin explains:

“The advantages of cloud computing to drug companies include storage of large amounts of data as well as lower cost, faster processing of those data. Users are able to employ almost any type of Web-based computing application. Researchers at the Biotechnology & Bioengineering Center at the Medical College of Wisconsin, for example, recently published a paper on the viability of using Amazon's cloud-computing service for low-cost, scalable proteomics data processing in the Journal of Proteome Research (DOI: 10.1021/pr800970z).”


While the savings in terms of cost and time are significant (particularly in terms of accelerated research), this is still new territory. Data security and a lack of standards for distributed storage and processing are issues when you consider the amount of sensitive data that the pharmaceutical sector must manage. Drug makers are left to decide whether it’s smarter to build the necessary infrastructure in-house or to shift their increasing computing burdens to the cloud.

Friday, June 05, 2009

Data Center Professionals Network

The other day I stumbled across the Data Center Professionals Network, a free online community for professionals from around the world who represent a cross section of the industry. Members include data center executives, engineering specialists, equipment suppliers, training companies, real-estate and building companies, colocation and wholesale businesses, and industry analysts. The recently launched networking site enables key players in the industry to easily connect, interact, and develop business opportunities.

According to Maike Mehlert, Director of Communications:

The Data Center Professionals Network has been set up to be a facilitator for doing business. It acts as a one-stop-shop for all aspects of the data center industry, from large corporations looking for co-location or real estate, or data centers looking for equipment suppliers or services, to engineers looking for advice or training.


Features of the social network include a personalized user profile, as well as access to job boards, business directories, press releases, classified ads, white papers, photos, videos and events.

I haven’t had a chance to join yet but if you want to check it out, visit http://www.datacenterprofessionals.net/ (you can sign in using a Ning ID if you already have one). If you do visit the site, post a comment and let me know what you think.